Utility-Scale Solar Parks Development (1 MWp to 50 MW+)

Comprehensive ground-mounted utility solar EPC: land topographic surveys, civil development, 33kV/132kV grid substation transmission, and centralized SCADA telemetry.

Ground-Mounted MW Power Plants
33kV/132kV Grid Evacuation
Full SCADA Cloud Telemetry

Utility Engineering & Transmission Capacity

TERRAIN AUDITED

Land Development & Topography

Complete site grading, soil resistivity testing, flood-risk hydrologic studies, and pile-foundation ramming for ground mount arrays (~4 acres per MW).

~4 Acres Footprint Per MW
  • FoundationsHydraulic Rammed Post
  • Drainage100-Year Flood Designed
  • Tilt AngleSeasonal Optimized Track
  • CorrosionHot-Dip Galv C4/C5 Class
CEA COMPLIANT

33kV / 132kV Substation EPC

Turnkey high-voltage switchyard construction, power transformer step-up, transmission line right-of-way (ROW), and state grid synchronization.

132 kV High Voltage Grid Tie
  • Step-Up33kV to 132kV Switchyard
  • IsolatorMotorized Dual Earth Bay
  • Grid CodeCEA Connectivity Norms
  • MeteringABT Compliant 0.2s Class
IEC 60870 FEED

Central SCADA Telemetry

Utility-grade SCADA telemetry conforming to CEA standards with real-time weather stations, pyranometers, inverter control, and state SLDC reporting.

Real-Time SLDC State Telemetry
  • SensorsClass-A Pyranometers
  • Inverter I/OString Level Telemetry
  • ProtocolIEC 60870-5-104 & OPC
  • SLDC SyncState Load Dispatch Link
UTILITY SOLAR CONSULTATION

Planning a Megawatt Ground-Mounted Solar Park?

Connect with JDC Solar's utility power plant engineers for comprehensive PVsyst yield simulations and grid evacuation feasibility.

Chat on WhatsApp